Steve Daines (R-MT)

A bill to require the Federal Energy Regulatory Commission to extend the time period during which licensees are required to commence construction of certain hydropower projects.

S. 1020 · Senate bill Energy

A Republican bill with 1 Democratic cosponsor · See all 7 cosponsors

Last activity — Became Public Law No: 119-90.

Became law

Passed both chambers and was signed by the President, or became law without a signature.

Nothing more in Congress: it is law. When it takes effect depends on the dates written into it — some parts start at once, others a year or more later.

Its path through Congress

  1. Introduced
  2. Passed Senate unanimous consent
  3. Passed House 394–14
  4. To President
  5. Became Law

The Senate by unanimous consent (no one objected, so there was no vote): no senator's position on it was recorded.

What this bill would do

This bill directs the Federal Energy Regulatory Commission to extend the timeframe for starting construction on certain hydropower projects. These "covered projects" are those where a license was issued before March 13, 2020. Upon a licensee's request and for good cause, the Commission may grant an extension of up to 6 years beyond the standard 8 years. The extension can be broken into up to three consecutive 2-year periods. Additionally, the bill allows for the reinstatement of licenses that expired after December 31, 2023, but before the act was passed.

Yes· 3 of 6

  • Scored +5

    Would business owners be better off under this?

    The bill benefits energy company owners by providing more time to commence construction and a mechanism to reinstate expired licenses.

  • Scored +3

    Is this likely to create jobs?

    The extension of construction timelines provides more time for hydropower projects to proceed, which may eventually create construction and operational jobs.

  • Scored +2

    Would people in rural areas be better off under this?

    Ensuring the continuity of hydropower projects can support local energy infrastructure in rural communities.

The opposite

  • Scored -2

    Does this better protect air, water and wildlife?

    By extending construction timelines for older hydropower projects, the bill may delay the transition to newer environmental standards or mitigate the impact of older infrastructure.

What Congress actually voted on

One recorded vote has been taken on this bill.

  • The House: a fast-track vote, needing two-thirds to pass The House sets aside its normal procedure to move quickly: no amendments, little debate, and a two-thirds bar instead of a simple majority. It is used for measures expected to be uncontroversial, so a bill that fails here failed despite broad expectations that it would not. Passed 394 yes · 14 no

    See who voted how →

    04/21/2026 · Roll call 129 · recorded as “On Motion to Suspend the Rules and Pass”